All Issue

2016 Vol.34, Issue 5 Preview Page
October 2016. pp. 421-436
Abstract
References
1
Bain R. (2009), Error and Optimism Bias in Toll Road Traffic Forecasts, Transportation, 36, 469-482.
2
Flyvbjerg B., Holm M., Buhl S. (2005), How (in) Accurate are Demand Forecasts in Public Works Projects?, Journal of the American Planning Association, 71, 131-146.
3
Flyvbjerg B., Holm M., Buhl S. (2006), Inaccuracy in Traffic Forecasts, Transport Reviews, 26, 1-24.
4
Irwin (2007), Government Guarantees: Allocating and Valuing Risk in Privately Financed Infrastructure Projects, World Bank.
5
Jung D.g. (2001), A Study on the Financial Risk Assessment of SOC Private Investment Projects, Master thesis, University of Seoul.
6
Kim K. S, Cho S. B, Yang I. S. (2012),Valuing the Risks Created by Road Transport Demand Forecasting in PPP project, Korea Development Institute.
7
Kim K. S. (2007), Rationalization for Decision-making on SOC Investment, Korea Development Institute.
8
Kim K. S. (2010), Rationalization for Decision-making on SOC Investment(Ⅱ): Risk Analysis of Estimated Subway Ridership, Korea Development Institute.
9
Lee D. H. (2016) Rational Allocation of Risks on PPP Project by Concession Contract, Legal Research Institute of Korea University, 80.
10
Lee Y. T., Kim S. B., Won J. M. (1999), Risk Analysis of Highway Investment by Private Sectors, J. Korean Soc. Transp., 17(5), Korean Society of Transportation, 33-42.
11
Ng S. T., Xie J., Cheung Y. K., Jefferies M. (2007), A Simulation Model for Optimizing the Concession Period of Public-private Partnerships Schemes, International Journal of Project Management, 25, 791-798.
12
Ng S. T., Xie J., Skitmore M., Cheung Y. K. (2007), A Fuzzy Simulation Model for Evaluation the Concession Items of Public-private Partnership Schemes, Automation in Construction, 17, 22-29.
13
Park K. A. (2007), A Comparative Analysis of PSC and PFI for a Cost-effective Solution for Sewage Treatment Facilities, Doctorate thesis, Seoul National University.
14
Shen L. Y., Bao H. J., Wu Y. Z., Lu W. S. (2007), Using Bargaining-Game Theory for Negotiation Concession Period for BOT-Type Contract, Journal of Construction Engineering and Management, 133(5), 385-392.
15
Shen L. Y., Li H., Li Q. M. (2002), Alternative Concession Model for Build Operate Transfer Contract Projects, Journal of Construction Engineering and Management, 326-330.
16
Shen L. Y., Wu Y. Z. (2005), Risk Concession Model for Build/Operate/Transfer Contract Projects, Journal of Construction Engineering and Management, 211-220.
17
Wachs M. (1992), Ethical Dilemmas in Forecasting for Public Policy, Public Administration Review, 42(6), 562-567.
18
Yu C.Y., Lam K.C. (2013), A Decision Support System for the Determination of Concession Period Length in Transportation Project Under BOT Contract, Automation in Construction, 31, 114-127.
19
Zhang X., AbouRizk S. M. (2006), Determining a Reasonable Concession Period for Private Sector Provision of Public Works and Services, Can. J. Civ. Eng, 33, 622-631.
Information
  • Publisher :Korean Society of Transportation
  • Publisher(Ko) :대한교통학회
  • Journal Title :Journal of Korean Society of Transportation
  • Journal Title(Ko) :대한교통학회지
  • Volume : 34
  • No :5
  • Pages :421-436
  • Received Date : 2016-05-23
  • Revised Date : 2016-07-22
  • Accepted Date : 2016-10-24