All Issue

2017 Vol.35, Issue 4 Preview Page
August 2017. pp. 278-291
Abstract
References
1
Garber, N., Zhao, M. (2002). Distribution and Characteristics of Crashes at Different Work Zone Locations in Virginia, Transportation Research Record: Journal of the Transportation Research Board, (1794), 19-25.
2
Gettman, D., Head, L. (2003). Surrogate Safety Measures from Traffic Simulation Models, Transportation Research Record: Journal of the Transportation Research Board, (1840), 104-115.
3
Hargroves, B. T. (1981). Vehicle Accidents in Highway Work Zones, Transportation engineering journal of the American Society of Civil Engineers, 107(5), 525-539.
4
Heaslip, K., Kondyli, A., Arguea, D., Elefteriadou, L., Sullivan, F. (2009). Estimation of Freeway Work Zone Capacity through Simulation and Field Data, Transportation Research Record: Journal of the Transportation Research Board, (2130), 16-24.
5
Korea Expressway Corporation (2015), Korea Expressway Work Zone Traffic Accident Condition.
6
Korea National Police Agency (2013), Installation and Manual for Traffic Sign.
7
Lee M. R., Lee, C., Kim D. G. (2013), The Proper Length of Transition Area for Work Zones on Urban Freeways, J. Korean Soc. Transp., 31(4), Korean Society of Transportation, 58-66.
8
Lin, P. W., Kang, K. P., Chang, G. L. (2004). Exploring the Effectiveness of Variable Speed Limit Controls on Highway Work-Zone Operations. In Intelligent Transportation Systems, 8(3), 155-168.
9
Li, Y., Bai, Y. (2012). Determining Optimal Deployment Location of Portable Changeable Message Sign Upstream of Work Zones, In Transportation Research Board 91st Annual Meeting, 12-0814.
10
Mohan, S., Zech, W. C. (2005). Characteristics of Worker Accidents on NYSDOT Construction Projects, Journal of Safety Research, 36(4), 353-360.
11
Nemeth, Z. A., Migletz, D. J. (1978). Accident Characteristics before, during, and after Safety Upgrading Projects on Ohio’s Rural Interstate System, Transportation Research Record, 672, 19-23.
12
Park, B., Qi, H. (2006). Microscopic Simulation Model Calibration and Validation for Freeway Work Zone Network a Case Study of VISSIM, In 2006 IEEE Intelligent Transportation Systems Conference, 1471-1476.
13
Park, J., Oh, C., Chang, M. (2013). A Study on Variable Speed Limit Strategies in Freeway Work Zone Using Multi-Criteria Decision Making Process, Journal of Korean Society of Transportation, 31(5), 3-15.
14
Zhu, J., Saccomanno, F. (2004). Safety Implications of Freeway Work Zone Lane Closures. Transportation Research Record: Journal of the Transportation Research Board, (1877), 53-61.
Information
  • Publisher :Korean Society of Transportation
  • Publisher(Ko) :대한교통학회
  • Journal Title :Journal of Korean Society of Transportation
  • Journal Title(Ko) :대한교통학회지
  • Volume : 35
  • No :4
  • Pages :278-291
  • Received Date : 2016-12-06
  • Revised Date : 2017-02-20
  • Accepted Date : 2017-08-01